In our experience, most FTL problems do not come from the rules themselves. They come from the distance between three versions of the same scheme: the one written in your operations manual, the one configured in your rostering system, and the one your crews actually fly. The diagnostic measures that distance and tells you what to close first.
When operators ask for it
- Before an authority audit or an inspection that will look at FTL
- After FTL findings, to close them for good rather than one at a time
- When adding an aircraft type, a base or a new kind of operation
- After a change of rostering system, or a major update of its rules
- When commander's discretion is used more often than it should be, or crews report fatigue
What we check
The scheme as written
The FTL chapter of your OM-A, or your FTL manual, against the rules your authority applies, including derogations and any approved individual scheme.
The scheme as configured
Limits, rolling windows, standby and positioning rules, time-zone handling, extension and discretion logic, and the alerts your planners rely on.
The scheme as flown
A representative period of actual rosters, typically three months, with commander's discretion reports and fatigue reports.
What you get
- A findings report, each finding ranked by criticality and tied to the rule it concerns
- A corrective action plan in order of priority, with an effort estimate for each action
- A one-hour debrief with your crew planning, flight operations and compliance people
How the two weeks run
- Before we start
A 30-minute call to set the scope. NDA if you want one, and a fixed fee agreed in writing.
- Week 1
Your FTL scheme and approvals, then the rule set of your rostering system, from read-only access or exports.
- Week 2
Rosters as flown, the longest and most complex duties recalculated by hand, then the report.
- Delivery
Report and action plan sent ahead of the debrief, so your team arrives with questions.
What we need from you
- The FTL chapter of the OM-A, or your FTL manual, in its current revision
- Read-only access to the rostering system, or roster, duty-time and rule-set exports
- The derogations and specific approvals in force
- The latest authority audit report and any open findings
- About half a day of a crew planner's time, spread over the two weeks
What it is not
- Not an audit on behalf of your authority. Nothing is reported to anyone: the report is yours.
- No changes in your systems. We read; you decide what to change.
- Follow-on work is separate. Rewriting the FTL chapter, reconfiguring the system or building a fatigue risk management process are scoped only if you ask.
Questions operators ask
Our authority does not apply the EASA rules.
We work against the rules your authority applies, whatever their source. The checks are the same; only the figures change.
Do you need access to our rostering system?
Read-only access saves time, but exports of rosters, duty times and the rule configuration are enough.
How is the fee set?
It is fixed before we start, based on fleet size, the number of crew and the period of rosters reviewed. Invoiced in euros, quotable in USD or AED.
Who does the work?
Our practice lead: current flight operations management at a European AOC holder, previously in charge of crew control and an operations control centre. More on who leads the work.
Start with a 30-minute call
Tell us your fleet, your authority and the date you are working to. You leave the call with a scope and a fixed fee.