Documentation your authority accepts. Procedures your crews can actually fly.
AOC certification, operations manuals, FTL and rostering, post-holder support and emissions compliance for air operators across the Gulf, Africa and Europe — every engagement led by a serving post-holder.
Four ways in — from a two-week diagnostic to a standing retainer.
01Usually under two weeks
FTL and rostering diagnostic
How your flight time limitations are configured in the rostering system — and how they are actually flown. A short, self-contained way to find out where you stand before an audit, a fleet change or anything larger.
You get
A findings report ranked by criticality
A corrective action plan in order of priority
A working debrief with the people who will carry the actions
Full scope and what we work from
What it covers
FTL rules, alert thresholds and derogation handling as configured in your rostering system
Rosters analysed as actually operated over a representative period
At-risk rotation patterns and configuration gaps identified
What we work from
Access to the rostering system, or roster and duty-time exports
The FTL section of the OM-A, or the OM-D
The latest authority audit report and open findings
An operations manual rewritten, or a certification or specific approval file assembled — ETOPS and low-visibility operations included — through to submission standard: OM-A to OM-D, Cabin Crew Manual, EFB Manual and airport briefings, whole or one volume at a time.
You get
A gap analysis and cross-reference matrix before the writing starts
The rewritten manual or assembled file, ready to submit
Continued support through the authority's review
Full scope and what we work from
What it covers
Specific approvals — ETOPS and low-visibility operations: OM-A to OM-D integration, AFM and FCOM consistency review, briefing forms, authority findings
Manuals rebuilt around the manufacturer's documentation — shorter, easier to keep current
Post-holder depth without a full-time hire — for a small AOC holder, a larger one between appointments, or an operator whose approvals have outgrown its office. Commonly two days a month, adjusted as the year demands.
You get
Planned days each month, agreed around your calendar
A regulatory watch scoped to your exact approvals
Audit preparation, and help closing findings
Full scope and what we work from
What it covers
Operations documentation kept current as the regulation moves
Manufacturer bulletins turned into crew notices, with read-and-sign tracking
FTL monitoring and early warning on roster drift
Reachable between interventions when something comes up
What we work from
Access to the documentation systems and the rostering platform
Two things operators rarely have time to do properly: getting real money out of the fuel bill, and keeping the emissions reporting satisfied without a scramble each spring.
You get
Fuel savings quantified from your own data
EU, UK and Swiss ETS, CORSIA and ReFuelEU reporting, on time
Correspondence with the administering state handled
Full scope and what we work from
What it covers
Fuel and energy policy reviewed against Part-CAT and against what is actually loaded
Discretionary fuel, flight planning and cost index settings reviewed across the network
Monitoring plans, annual reporting and verification support
Crew engagement, so the programme survives after the consultant leaves
What we work from
Your current fuel policy and the OM-A section covering it
Flight and fuel data over a representative period
The approved monitoring plan, if one is in force
Last year's emissions report and any verifier correspondence
Selected work led by the practice lead. Operators are not named here — confidentiality is part of the job. The detail is for a call.
Two initial AOC certifications — EU member states
A complete operations manual suite built from scratch, OM-A to OM-D with the Cabin Crew and EFB Manuals, carried through authority review to approval; and the documentation and operational tools behind a second new certificate.
Foreign operator permits — seven authorities
Across Europe, the Middle East, Asia and North America, each reconciling an EASA documentation set with national requirements.
FTL configuration review
Rostering-system parameters reconciled with the approved FTL scheme; discrepancies taken up with the software vendor and the manual corrected.
Operations control centre — North Africa
OCC and crew planning function set up for a European operator: structure, procedures and the team for flight following, flight preparation and crew control.
Crew planning centralisation
Crew planning brought into a single department at a European AOC holder, with the rostering system and FTL monitoring that go with it.
Compliance monitoring dashboard
Designed at one EU operator, then redeployed at another ahead of a national authority oversight audit.
Audits and corrective action plans
Mass and balance, cargo and outsourced dispatch audited internally; participation in oversight audits by two EU national authorities; corrective action plans written after an authority inspection and two internal audits — root causes, extent of condition, actions entered in the operator's safety system.
Ground instruction
Flight time limitations taught to planning staff and crews, and dangerous goods awareness for an operator not approved to carry them.
How we work
From first call to delivered file.
1
A first call, free
Thirty minutes. You describe the file and the deadline; you leave with a straight answer on whether we can carry it and roughly what it takes.
2
A scoped proposal
Priced once the brief is understood — fixed fee, day rate or monthly retainer — with dates anchored on your authority deadline.
3
Phased delivery
A deliverable at each phase, a named counterpart on each side, and support through the authority's review.
Invoiced in euros, quotable in USD or AEDPayment staged against deliverablesRemote-first, on site when the file calls for it
Who leads the work
Practice lead
Flight operations & compliance
Current
Serving post-holder in flight operations at a European AOC holder; line pilot, Airbus A320 family
Previously
Authority-accepted nominated person, ground operations, at an EU AOC holder
Licence
EASA professional pilot licence, current · ATPL theory
Education
MSc Aeronautical Engineering — air operations and maintenance
Name and full CV shared on the first call — under NDA if you prefer.
The questions operators usually ask before a first call.
What happens on the first call?
Thirty minutes, at no cost. You describe the file and the deadline; you leave with a straight answer on whether OPS Meridian can carry it and roughly what it takes. Nothing is quoted before the brief is understood.
Is what we share kept confidential?
Yes. We are happy to sign your NDA before any document changes hands, and clients are never named without their agreement.
Can you work under our name?
Yes. OPS Meridian works white-label as readily as under its own name: deliverables arrive in your template, under your document control and your cover. A client introduced by a partner stays that partner's client.
Do you work outside EASA?
The practice is EASA-centric, with GCAA and GACA requirements within scope for Gulf operators. Foreign operator files have been prepared for seven authorities, including the UK CAA and the FAA. Where an operator sits outside EASA, the applicable national requirements become part of the brief.
Do you work with our rostering and ops systems?
The method is platform-agnostic. Rostering, dispatch and safety platforms have been specified, configured and deployed, with hands-on experience including Leon, FL3XX, PPS and IQSMS.
How is an engagement priced?
Once the brief is understood: a fixed fee per assignment, a day rate, or a monthly retainer for continuing support. Invoiced in euros, quotable in USD or AED, with payment staged against deliverables.
Can you come on site?
Work is remote-first, with on-site presence arranged wherever a file calls for it — in the Gulf, Africa or Europe. Documentation is drafted directly in English or French rather than translated after the fact.
Contact
Send us the file you're stuck on. Thirty minutes is usually enough to tell you whether OPS Meridian can carry it, and roughly what it takes.